Large open deck which is ideal for buoy operations, deck cargo and classes. Tall A-frame works well for coring, ROV and buoy operations. Crane is used for buoy, ROV and other sampling equipment deployment and recovery. J Frame for CTD and other the side operations. Removable dive ladder for supporting dive operations. Flood lights for night operations.
- A-Frame 16,000 LB SWL
- CTD winch -2,600 ft 7 conductor wire 2,000LB SWL
- Heavy Duty Winch- 600′ ½” wire 10,000 LB SWL
- Trawl Winch – 2,000 3/8 wire 5,000 lb SWL
- Deck Pay Load- 12 Tons
- Deck work area without 20′ van 625 sq.ft , 350sq.ft w/ 20′ van
- J-Frame -2,000LB SWL
- Deck sockets 2′ center
- Removable bulwarks
- Crane 5,000 LB full extension
- 14′ RIB w/ 25 hp outboard